Skip to content Skip to search

2025 Traffic Regulation Orders (TROs)

Norfolk County Council TROs for Norwich. 

April

  • 2 April 2025 - Continuation of temporary closure of Boatman Way – Due to Cadent gas main replacement works. The closure/restriction has gone beyond the anticipated dates (as shown in notice dated 19 March, below, and is now anticipated to be in place until 11 April 2025.
  • 2 April 2025 - West End Street, Play Street and map (Wen Sum Neighbours Summer Street Party) – Temporarily restricted (except for emergency and pedestrian access) on Saturday 9 August 2025 between 11am and 7pm.
  • 2 April 2025 - Wellington Lane Emergency Notice – Emergency electrical fault works from 2 to 11 April 2025.
  • 4 April 2025 - Various TTROs – Proposed: Rosary Road, Bluebell Road. Made: Mount Pleasant, St Andrews Street.
  • 7 April 2025 - Quebec Road – water leak repairs 7 to 11 April 2025 possibly extending to 27 April 2025.
  • 8 April 2025 - Southgate Lane Emergency Notice – Repairs to missing water cover, 8 to 11 April 2025.
  • 11 April 2025 - Old Palace Road and Heigham Road - Emergency gas works until 17 April and possibly to 20 April 2025.
  • 14 April 2025 - Humbleyard Emergency Notice – Repairs of a visibly leaking water main from 14 to 18 April 2025 but the Road may continue to be closed/restricted until the 4 May 2025.
  • 15 April 2025 - Road closures for multiple events in 2025 
  • 18 April 2025 various TROs - Churchill Road 30 April (may continue to 11 June), Saint George Street and Cross Lane 5 May (may continue to 16 June), Telegraph Lane East 12 May (may continue to 23 June). Wensum Street 27 April and 4 May (may continue to 15 June), Clabon Road 22 to 24 April (may continue to 3 June) and Tombland 22 April (may continue to 3 June). Various works.
  • 17 April 2025 - Continuation of emergency road closures of Old Palace Road and Heigham Road (dated 11 April) – The closure/restriction has gone beyond the anticipated dates and is now anticipated to be in place until 28 April 2025. 

March

February

  • 7 February 2025 - Various TTROs – Proposed and made.
  • 14 February 2025 - Various TTROs – Proposed and made.
  • 14 February 2025 - Waterloo Road Continuation of previous notice - Closures and parking restrictions off Waterloo Road, Patteson Road and Angel Road for reconfiguration works on junction.
  • 14 February 2025 - Shipstone Road Continuation of previous notice - Road closure and parking restriction of due to junction reconfiguration works.
  • 19 February 2025 - Continuation of Peckover Road TTRO 14 February, above – Anglian water works now until 3 March 2025.
  • 19 February 2025 - Continuation of Castle Meadow TTRO 7 February, above – Rebuild of telecom chamber now until 22 February 2025.
  • 20 February 2025 - Cowgate from 20 to 27 February 2025 and possibly to 12 March 2025 - gas leak repairs
  • 21 February 2025 Various TTROs – proposed and made
  • 21 February 2025 - Whitehall Road  – 4 to 5 March and possibly to 17 April 2025 - electrical works
  • 26 February 2025 - Glenmore Gardens Continuation – Road closure for new water connection works until 28 February 2025.
  • 28 February 2025 - Various TTROs – Proposed: Goldsmith Street, Woodhall Rise Footpath, Mile Cros Road and Drayton Road. Made: Mornington Road, Cotman Road, Whitehall Road.

January


Previous years

Feedback button
Feedback button